• Home
  • Sto Systems
    RENDER SYSTEMS

    Concrete Block Construction

    Render Systems for Concrete Block Construction

    Render Brick Construction

    Render Systems for Brick Construction


    EPS Construction

    Render Systems for Polystyrene Block Construction


    AAC Panel Construction

    Solutions for AAC Panel
    Construction


    AFS LOGICWALL Construction

    Solutions for AFS LOGICWALL Construction

    Knauf Permarock Construction

    Solutions for Knauf Permarock Construction


    Cement Sheet
    Construction

    Solutions for Cement Sheet Construction

    Concrete Construction

    Solutions for Concrete Construction


    EasyLap Panel
    Construction

    Solutions for EasyLap Panel Construction

    COATINGS

    Exterior Facade Paints

    Paints for Exterior
    Applications


    Sto Finishing Renders

    Coloured Finishing Renders for
    Sto Systems


    StoColor System

    A planning tool to assist in finding a colour for your Sto System

    REFURBISHMENT

    Exterior Render Repair Systems

    Repairs for cracked and leaky substrates



    MORE STO

    Sto Specialty Products

    Specialty products for Unique Construction Solutions

  • Detail Finder
    Detail Finder

      for

     

    Search Sto
  • About
  • News
  • StoSignature
  • Unitex

Launch of the Drying Green

What an amazing result when building with Sto!

The Drying Greens Park to be officially opened by the Lord Mayor of Sydney next Saturday will be at the heart of Sydney’s fastest-growing suburb closest to the CBD. Next to the Gunyama Aquatic and Leisure centre where the façade is sto render finished in Stolit MP natural; the Drying Greens Park modern cutting-edge amenities building in the centre of the park (pics) is designed by architecture firm CHROFI and rendered with Sto Armat render finished in Sto Signature 30 texture on cement board on lightweight frames. The brief was that sto had to achieve the look and functional benefits of the actual tilt-up concrete materiality. The Sto armat reinforced plaster system was specified to give a very strong, high impact resistant, and highly durable façade yet lightweight for ease of construction. The sto texture team worked to create the bespoke finish using Sto finishes to perform and look like concrete tilt-up materiality.

The specification of sto successfully made it from design, to build despite competition is because Sto offered a version of the Sto Ventec Rainscreen System setup approach, where we utilised knauf permarock cement board for the strength, flexibility and seamless promise, and Sto worked with the builder, renderer, and the architect to create a bespoke rendered finish when finished was unmatched by other render or façade systems suppliers.

This project is meant to create a profile for Sto as the first of many in the park and recreational sector, and local councils for more public works projects. The site teams and architect felt that we have achieved this, and I congratulate all for the endless toiling, never giving up attitude; and a service-based mindset approach; from within and outside Sto. A hearty thanks!